본문 바로가기

أخبار الشركة

Wins facility building work in OO area

2007-07-20

On July 20, the consortium led by Ssangyong Eng & Const won the facility work project in OO area for 14.6 billion won (Ssangyong’s portion: 13.3 billion won or 90%) from the ROK Army. The military facility work is comprised of site formation and construction of 38 buildings (total floor size: 10,346.88㎡) in an area in Anseong. The work is scheduled to be completed by November 30, 2008.