أخبار الشركة
Ssangyong E&C wins work for Yeongduk-Osan highway (Route 311)
2006-07-12
On July 12, the consortium, including Ssangyong E&C, won the contract to build Sector 3 of the Yeongduk-Osan highway (Route 311) fromKorea Land Corporation for KRW 98 billion (Ssangyong’s portion: KRW 19.6 billion or 20%).
Upon completion, the 3,255 m, six-lane highway will be linked to the Yongin-Seoul Highway, thus smoothing traffic flow in southern Gyeonggi. The work includes construction of seven bridges.